This page documents the work to scope the OASIS 3 upgrade that is occurring under the Mooring Maintenance project.

Documents

Related Work

  • NDBC Mooring Upgrade
  • PDR Slides
    • Reporting Cameras
    • Temperature Profiling
    • Target Deployment Date: 2015 Summer
    • Clamp on mounting on buoys (electrically independent of host buoy for legacy buoys)
    • Wireless (802.15.4) connectivity between modules and UIs (modular)
    • AIS receiver
    • XML formatted messages (AES-128 bit encryption)
    • Distributed processing
    • Rechargeable Li-ion
    • On power up, central hub queries system and sends configuration message (self-describing)
    • 4x30W Solar panels, 12 SMBus Smart Batteries, 2SMBus Charge Controllers, 1 Smart Module
    • Hub Coordiantor:
      • Master Clock from GPS
      • Registers System Configuration
      • Monitors System Health
      • Stores XML Messages
      • Packet Builder (parser) is hosted in hub
      • Back channel access
    • Iridium for MET and AIS data
    • RUDICS for images
    • Processors: MPU-9150 and Gumstix

PDR for Sandy Day01 System Overview MBARI.pptx (application/vnd.openxmlformats-officedocument.presentationml.presentation)