This page documents the work to scope the OASIS 3 upgrade that is occurring under the Mooring Maintenance project.
Documents
Related Work
- NDBC Mooring Upgrade
- PDR Slides
- Reporting Cameras
- Temperature Profiling
- Target Deployment Date: 2015 Summer
- Clamp on mounting on buoys (electrically independent of host buoy for legacy buoys)
- Wireless (802.15.4) connectivity between modules and UIs (modular)
- AIS receiver
- XML formatted messages (AES-128 bit encryption)
- Distributed processing
- Rechargeable Li-ion
- On power up, central hub queries system and sends configuration message (self-describing)
- 4x30W Solar panels, 12 SMBus Smart Batteries, 2SMBus Charge Controllers, 1 Smart Module
- Hub Coordiantor:
- Master Clock from GPS
- Registers System Configuration
- Monitors System Health
- Stores XML Messages
- Packet Builder (parser) is hosted in hub
- Back channel access
- Iridium for MET and AIS data
- RUDICS for images
- Processors: MPU-9150 and Gumstix
|